FACTORY OPEN · MON–SAT · 09:00–18:00 GMT+8 [email protected] · EN
Home Chargers Power Banks Videos Solutions Factory Contact Get a Quote →
LEVA 240W GaN desktop charger
LEVA 730W GaN charger
LEVA factory exhibition
LEVA factory floor
// LEVA · Est. 2013 · Shenzhen

High-wattage
GaN charging,
built to scale.

From 65W travel chargers to the 1000W flagship. We design and manufacture multi-port desktop charging stations powering offices, retail floors and data labs across 60+ countries — and we ship 200,000 units a month.

12+
Years in market
200K/mo
Production output
60+
Export markets
WALMART TESCO CARREFOUR MEDIAMARKT FNAC BEST BUY MEIZU ZTE WALMART TESCO CARREFOUR MEDIAMARKT FNAC BEST BUY MEIZU ZTE
Years operating
12+
Founded 2013, Shenzhen Bao'an
Factory floor
3,000
SMT, aging, QC, packaging
Monthly output
200K
Units shipped per month
Export reach
60+
Countries served
// Catalog · 14 models

From travel charger to 1000W flagship.

Every model is GaN-based, multi-port, and engineered for full-load 24/7 operation. Pick by deployment density, not by hopeful spec sheets.

See all 14 models →
// High-output series

730W. Six laptops. One outlet.

The 730W class delivers PD140W on the lead port and QC30W across four USB-A ports. Replace six wall bricks with one quiet desktop unit.

LEVA 730W GaN charger banner
// Why LEVA

Engineered for
continuous duty.

Most desktop chargers are designed for a single laptop. Ours are designed for racks of laptops, all day, every day. The difference shows up in component selection, thermal margin, and what happens when one port shorts.

GaN⁴ silicon

Latest-gen gallium nitride switching for higher density and lower heat output. 30% smaller per watt than legacy silicon.

Per-port intelligence

PD 3.1, PPS, QC 3.0/4.0, BC 1.2 negotiated independently per port. No fixed allocation. The charger figures it out.

140W on tap

Up to PD 140W on the lead port. The 1000W flagship sustains four ports at 140W simultaneously without throttle.

Eight-hour aging

Every unit runs at 100% load for eight hours before it leaves the line. We catch the failures so you don't.

// Factory · Shenzhen

3,000m² of vertical integration.

SMT, transformer winding, plastics, aging, QC, and pack-out — under one roof in Bao'an, twenty minutes from SZX airport.

LEVA factory Headquarters Bao'an, Shenzhen — three buildings, single campus
LEVA workshop Workshop SMT & assembly
LEVA exhibition Trade shows Global presence
LEVA office HQ office Engineering & sales
LEVA certifications Certifications CE / FCC / RoHS / BSCI
Tour the factory →

We've run LEVA's 800W units across our retail demo benches for two years. Twelve hours a day, every port loaded. Failure rate so far is below half a percent. That's the only spec sheet that matters.

— Procurement Lead, European Electronics Retailer (NDA)
// Let's talk specs

Spec'd for your floor.
Built in our factory.

OEM logo, custom port configurations, region-specific plugs, and private-label packaging. MOQ from 500 units. Lead time 22–25 days.